|
Colorado River Bridge at Hoover Dam |
For this project, CTE staff performed a structural review of the form travelers supplied by NRS Asia. The review included the design drawings, calculations and operating procedures.
Colorado River Bridge at Hoover Dam between Arizona and Nevada
• Clear span of the finished concrete arch will be 1060ft (323m), over a 900ft (274m) deep gorge Arch ribs are cast separately, and later joined by steel bracing Arch halves are being built simultaneously to save time The closure pours will be done with the travelers, thus requiring no special formwork
|
|