For this 7400ft long post-tensioned concrete guideway structure, CTE was the Engineer-of-Record and designer for both the substructure and superstructure, providing the calculations, contract drawings and specifications. The scope of work also included on-site inspection and trouble-shooting of the on-going work and supervision for the erection of the curved spans with their 100ft radius. Since then, CTE has also been providing regular inspection services and maintenance procedures for the Owner.
Clarian Health SDI Automated People Mover, Indianapolis IN
• This system was a first for being built on public-right-of-way• It connects three hospitals and is open for public use• Schwager Davis Inc. of San Jose CA, was the Design/Build Contractor• From project inception to completion took only 2 years
|